During the initial set up and test rides, I used some 25 lb. bags of grass seed that I had handy to test various loads and distributions.
I would ride a defined loop, change some weight, then ride the same loop, noting any changes.
There is a bridge, with a decent transitional bump.
Why can't the bridge engineers and road engineers use the same tape measure or transit or two sticks and a piece of string?
Anyway, for your viewing pleasure,
Here are a few test rides over the bridge as well as a few twisties for good measure.
The video files have been compressed to fit on the forum.
Bridge South Empty
I would ride a defined loop, change some weight, then ride the same loop, noting any changes.
There is a bridge, with a decent transitional bump.
Why can't the bridge engineers and road engineers use the same tape measure or transit or two sticks and a piece of string?
Anyway, for your viewing pleasure,
Here are a few test rides over the bridge as well as a few twisties for good measure.
The video files have been compressed to fit on the forum.
Bridge South Empty